 Newlands Project 
 Engineering Data

Newlands Project  -  Main Page

Facilities in Operation

Storage Dams

3      

Diversion Dams

2      

Canals

68.5 mi  

Laterals

312.1 mi  

Drains

345 mi  

Powerplants

1      

Transmission Lines

73 mi  

Tunnels

0.5 mi  


Storage Facilities

Diversion Facilities

Carson River Diversion Dam

Type:

Concrete gate structure

Location

On the Carson River, 5 miles northeast of Lahontan Dam

Year Completed

1905  

Dimensions:

 

   Structural height

23 ft  

   Hydraulic height

14 ft  

   Crest length

241 ft  

   Crest elevation

4,024.0 ft  

   Volume

3,000 yd3  

   Diversion capacity

1,950 cfs  


Derby Diversion Dam

Carriage Facilities

"T" Canal

Location

East from Carson River Diversion Dam and north of Carson River to vicinity of Fallon, Nevada.

Construction period

1904-1905  

Length

9 mi  

Diversion capacity

450 cfs  

Typical section - initial reach

 

   Bottom width

10 ft  

   Side slopes

2:1  

   Water depth

6 ft  


Truckee Canal

Location

From Derby Diversion Dam southeast to Lahontan Dam.

Construction period

1903-1906  

Length

32.5 mi  

Diversion capacity

900 cfs  

Typical section - initial reach

 

   Bottom width

20 ft  

   Side slopes

0.5:1  

   Water depth

13 ft  


"V" Canal

Location

East from Carson River Diversion Dam and south of Carson River to the vicinity of Fallon, Nevada.

Construction period

1904-1905  

Length

27 mi  

Diversion capacity

1,500 cfs  

Typical section - initial reach

 

   Bottom width

22 ft  

   Side slopes

2:1  

   Water depth

12 ft  


Tunnel No. 1  -  Truckee Canal

Location

Along the Truckee Canal

Construction period

1903-1906  

Length

905 ft  

Diversion capacity

1,500 cfs  

Cross section:

Horseshoe

   Diameter

15.3 ft  


Tunnel No. 2  -  Truckee Canal

Location

Along the Truckee Canal

Construction period

1903-1906  

Length

309 ft  

Diversion capacity

1,500 cfs  

Cross section:

Horseshoe

   Diameter

15.3 ft  

   Lining thickness

8 in  


Tunnel No. 3  -  Truckee Canal

Location

Along the Truckee Canal

Construction period

1903-1906. Rehabilitated in 1976  

Length

1,521 ft  

Diversion capacity

1,500 cfs  

Cross section:

Horseshoe

   Diameter

15.3 ft  


Power Facilities

    Lahontan Powerplant

 

 