Cachuma Project - Main Page
Facilities in Operation
|
Storage Dams |
5 |
|
Pumping Plants |
5 |
|
Pipelines |
24.3 mi |
|
Tunnels |
7.5 mi |
|
Laterals |
97.2 mi |
|
Storage Facilities
Bradbury Dam Carpinteria Dam Glen Anne Dam Lauro Dam Ortega Dam
Carriage Facilities
South Coast Conduit
|
Type: |
Reinforced concrete |
|
Location |
Generally east along the Pacific Coast from Tecolte Tunel outlet portal near Goleta, California, to vacinity of Carpenteria, California. |
|
Construction period |
1950-1953 |
|
Length |
24.3 mi |
|
Capacity |
70 cfs |
|
Diameter |
48-27 in |
|
Sheffield Tunnel
|
Location |
On the South Coast Conduit within city limits of Santa Barbara , California |
|
Construction period |
1951-1953 |
|
Length |
5,968 ft |
|
Capacity |
22 cfs |
|
Cross section: |
Horseshoe |
|
Diameter |
7 ft |
|
Lining thickness |
3-7 in |
|
Tecolote Tunnel
|
Location |
From Cachuma Reservoir to Glen Anne Reservoir, northwest to Goleta, California |
|
Construction period |
1950-1956 |
|
Length |
33,557 ft |
|
Capacity |
100 cfs |
|
Cross section: |
Horseshoe |
|
Diameter |
7 ft |
|
Lining thickness |
4-8 in |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Carpenteria Distribution System |
|
|
|
|
|
Carpenteria |
2 |
5.3 |
280 |
--- |
|
Lateral 10-L |
1 |
0.7 |
310 |
--- |
|
Shepard Mesa Extension |
2 |
1.8 |
193 |
--- |
|
Goleta Distribution System |
|
|
|
|
|
Lateral 13-1 |
3 |
0.7 |
225 |
--- |
|
Summerland Distribution System |
|
|
|
|
|
Lateral 3 |
|
|
|
|
|
|