CRBSCP - Las Vegas Wash Unit - Main Page |
|
|
|
Facilities Authorized for Construction - First Stage |
|
|
|
|
Barrier |
1 |
|
Intake pumping plant |
1 |
|
Reject pumping plant |
1 |
|
Evaporation ponds |
25 |
|
Bypass pipeline |
5 mi |
|
|
|
|
Collection Facilities
Interception and Collection System
Interception System
Collection System
Carriage Facilities
Supply Pipeline |
|
|
|
Location |
From the Intake Pumping Plant to a regulating tank at the desalting plant site. |
|
Construction period |
|
|
Description |
Precast concrete pipe. |
|
Length |
0.27 mi |
|
Diameter |
27 in |
|
Capacity |
20 cfs |
|
|
|
|
Reject Brine Pipeline |
|
|
|
Location |
From the reject pumping plant to the evaporation ponds |
|
Construction period |
Construction delayed |
|
Description |
Precast concrete pipe. |
|
Length |
3.5 mi |
|
Diameter |
18 in |
|
Capacity |
10 cfs |
|
|
|
|
Bypass Pipeline - (First and Second Stages) |
|
|
|
Location |
From Clark County's Advance Wastewater Treatment Plant along the north side of Las Vegas Wash; terminates downstream of the Barrier. |
|
Construction period |
Scheduled 1978-1980 |
|
Length |
5 mi |
|
Diameter |
66-78 in |
|
Capacity |
240 cfs |
|
|
|
|
Regulating Tank |
|
|
|
Location |
Desalting plant site. |
|
Construction period |
Construction delayed |
|
Description |
Steel |
|
Length |
30 ft |
|
Diameter |
50 ft |
|
|
|
|
Las Vegas Wash Membrane Desalting Plant |
|
|
|
Location |
On the south side of Las Vegas Wash about 1,400 ft upstream from the intake pumping plant near the barrier. |
|
Construction period |
Not yet scheduled |
|
Description |
Reverse osmosis |
|
Quality input |
4,200 ppm |
|
Quality output |
700 ppm |
|
Quantity |
20 cfs |
|
Plant site: |
|
|
Length |
676 ft |
|
Width |
355 ft |
|
Plant capacity |
13 MGD |
|
|
|
|
Product Water Pipeline |
|
|
|
Location |
From the desalting plant to a settling pool in Las Vegas Wash immediately below the barrier dam. |
|
Construction period |
|
|
Length |
0.28 mi |
|
Diameter |
18 in |
|
Capacity |
18 cfs |
|
|
|
|
Power Supply - First and Second Stages
Power for the facilities will be provided by the Nevada Power Co. It is expected the company will extend an existing 12-kV line 8,900 ft to the intake pumping plant and desalting plant sites. Control meters located at each load area will provide final adjustment for utilization voltages.
Pumping Plants |
|
|
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
First stage intake |
3 |
10.5 |
105 |
|
|
Reject |
3 |
10.5 |
199 |
|
|
Second Stage intake additions1 |
2 |
10.5 |
105 |
|
|
|
1 Second stage facilities (essentially an addition of a desalting plant to the first stage, some modification to first stage facilities will be required). |
|
|
| |
|
|
|
|
|
|
Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links |