Robert B. Griffith Water Project - Main Page
Facilities in Operation - First Stage
|
Storage Dams |
1 |
|
Main Aqueduct |
2.97 mi |
|
River Mountain Tunnel |
4 mi |
|
Laterals |
32.1 mi |
|
Pumping Plants |
9 |
|
Facilities in Operation - Second Stage
|
Main Aqueduct "B" Line |
2.39 mi |
|
Pittman Lateral |
19.79 mi |
|
Pumping Plants |
6 |
|
Storage Facilities
Hoover Dam
Carriage Facilities - First Stage
Saddle Island Intake Facilities and Tunnel
|
Location |
Extends from the east side of Saddle Island in Lake Mead though the island to the west, and terminates in a pump chamber below Pumping Plant No.1. |
|
Construction period |
1969-1971 |
|
Length |
0.27 mi |
|
Capacity1 |
623 cfs |
|
Cross section: |
Horseshoe |
|
Diameter |
156 in |
|
Elevation of inlet |
1,018.1 ft |
|
Lining: |
Generally unlined |
|
Access adit: |
Provides access to the intake tunnel and pumping plant chamber through an inclined tunnel. |
|
Length |
1,400 ft |
|
Width |
14 ft |
|
Type: |
Modified horseshoe |
|
Slope |
0.17 |
|
1 The tunnel was designed to provide capacity for both first and second stage operation |
Main Aqueduct
|
Location |
Extends from Pumping Plant No.1 to the River Mountain Tunnel. |
|
Construction period |
1970-1971 |
|
Description |
Prestressed circular concrete |
|
Length |
2.97 mi |
|
Diameter |
120-96 in |
|
Capacity |
585-300 cfs |
|
River Mountain Tunnel
|
Location |
Excavated through the River Mountains, which lie between Las Vegas Valley and Lake Mead. |
|
Construction period |
1968-1970 |
|
Length |
3.78 mi |
|
Diversion capacity |
500-608 cfs |
|
Cross section: |
Circular |
|
Diameter |
121.5-156 in |
|
Lining: |
Concrete |
|
Thickness |
15-21 in |
|
Las Vegas Valley Lateral
|
Location |
Begins at the outlet portal of the River Mountain Tunnel and runs to the Whitney Bifurcation |
|
Construction period |
1970-1971 |
|
Description |
Cylindrical |
|
Prestressed concrete pipe |
3.08 mi |
|
Steel pipe, mortar lined |
3.38 mi |
|
Steel pipe, coal-tar coated |
0.53 mi |
|
Total length: |
6.99 mi |
|
River Mountain Tunnel to Henderson Bifurcation |
0.97 mi |
|
Henderson Bifurcation to Whitney Bifurcation |
6.02 mi |
|
Diameter |
96-90 in |
|
Initial capacity |
289-261 cfs |
|
North Las Vegas Lateral
|
Location |
Begins at the Whitney Bifurcation and extends to a terminal reservoir near Nellis Air Force Base. |
|
Construction period |
1970-1971 |
|
Description |
. |
|
Steel pipe, coal-tar coated |
0.21 mi |
|
Steel pipe, mortar lined |
8.42 mi |
|
Pretensioned concrete |
1.37 mi |
|
Length |
10 mi |
|
Diameter |
72-24 in |
|
Capacity |
101-16 cfs |
|
Whitney Lateral
|
Location |
Begins at the Whitney Bifurcation and extends in an easterly direction to a terminal reservoir near the intersection of Flamingo Road and Pecos Road. |
|
Construction period |
1970-1971 |
|
Description |
|
|
Steel pipe, coal-tar coated |
1.63 mi |
|
Steel pipe, mortar lined |
1.65 mi |
|
Length |
3.28 mi |
|
Diameter |
66 in |
|
Capacity |
160 cfs |
|
Sahara Lateral
|
Location |
Begins at Sahara Bifurcation and extends eastward to the Sahara Flow Control Station. |
|
Construction period |
1970-1971 |
|
Description |
Steel pipe, mortar lined and coated |
|
Length |
0.34 mi |
|
Diameter |
24 in |
|
Capacity |
15 cfs |
|
Henderson Lateral
|
Location |
Begins at the Henderson Bifurcation works in the Las Vegas Valley Lateral and extends in a south westerly direction to the city of Henderson terminal tank. |
|
Construction period |
1968-1971 |
|
Description |
Steel pipe, mortar lined and coated |
|
Length |
4.53 mi |
|
Diameter |
36 in |
|
Capacity |
28 cfs |
|
Boulder City Lateral
|
Location |
Begins at Pumping Plant No.1A and terminates at the twin receiving tanks near Boulder City, Nevada. |
|
Construction period |
1968-1969 |
|
Description |
Pretensioned concrete and steel-lined pipe. |
|
Length |
7.48 mi |
|
Diameter |
36-27 in |
|
Capacity |
30 cfs |
|
Alfred Merritt Smith Water Treatment Facilities
|
Location |
Constructed by the State of Nevada near Pumping Plant 1A near the west shore of Lake Mead opposite Saddle Island. |
|
Construction period |
1968-1970 |
|
Description |
The water treatment plant provides for pretreatment, aeration, taste and color control, flocculation, filtration, chlorination, and corrosion control. |
|
Capacity |
34.5 MGD |
|
Number of Flocculation units |
10 |
|
Number of filters |
20 |
|
Surface area of filters |
56,000 ft2 |
|
Filter rating at maximum flow |
5 ft2 |
|
Filter mediator |
|
|
Anthracite coal |
20 in |
|
Sand |
10 in |
|
Filter backwash rate |
22.5 cfs |
|
Chemical additives: |
Chlorine, sulfur dioxide, potassium permanganate, sodium silicate, activated silica, caustic soda, aluminum sulfate, activated carbon, and polyelectrolyte. |
|
Carriage Facilities - Second Stage
Main Aqueduct "B" line
|
Location |
Runs from Pumping Plant 1B to the River Mountains Tunnel. |
|
Construction period |
1977-1979 |
|
Description |
Prestressed circular concrete |
|
Length |
2.39 mi |
|
Diameter |
96-108 in |
|
Capacity |
306 cfs |
|
Pittman Lateral
|
Location |
Begins at the outlet portal of the River Mountains Tunnel and extends to Oakey Blvd. |
|
Construction period |
1978-1981 |
|
Description |
|
|
River Mountain Tunnel portal to Mesa Lateral Bifurcation |
6.57 mi of 8.5-ft-diameter steel pipe with Pritec coating and field applied mortar lining |
|
Mesa Lateral Bifurcation to Valley View Regulating Tank |
9.59 mi of 7.5- and 8.0-ft-diameter steel pipe with Pritec coating and field applied mortar lining |
|
Valley View Regulating Tank to Oakey Turnout |
3.63 mi of 7.0-ft-diameter reinforced concrete pipe. |
|
Length |
19.79 mi |
|
Diameter |
102-84 in |
|
Capacity |
232-319 cfs |
|
Fayle Lateral
|
Location |
From Valley View Regulating Tank to Fayle Reservoir. |
|
Construction period |
1980 |
|
Description |
Steel pipe with Pritec coating and field applied mortar lining. |
|
Length |
0.34 mi |
|
Diameter |
72 in |
|
Capacity |
140 cfs |
|
Twin Lakes Lateral
|
Location |
Begins at the Oakey Turnout, the end of Pittman Lateral, and extends to Carlton Square Reservoir. |
|
Construction period |
1981-1982 |
|
Description |
Pretensioned concrete cylinder pipe |
|
Length |
5.36 mi |
|
Diameter |
33, 36, 42, 48 in |
|
Capacity |
32-82 cfs |
|
Foothill Lateral
|
Location |
Begins at Foothill Turnout on Pittman Lateral, and extends to Foothill Tank (constructed by City of Henderson) |
|
Construction period |
1981 |
|
Description |
Asbestos-cement pressure pipe |
|
Length |
0.20 mi |
|
Diameter |
21 in |
|
Capacity |
12 cfs |
|
North Lateral
|
Location |
Begins at North Lateral Turnout on Pittman Lateral and extends to a reservoir constructed by the City of Henderson at a site near the city's north boundary. |
|
Construction period |
1980-1981 |
|
Description |
Asbestos-concrete pressure pipe and steel coal-tar enameled coated pipe. |
|
Length |
0.58 mi |
|
Diameter |
24 in |
|
Capacity |
11 cfs |
|
Mesa Lateral
|
Location |
Begins at Mesa Lateral Bifurcation on Pittman Lateral and runs to receiving tank built by the city of Henderson. |
|
Construction period |
1980-1982 |
|
Description |
Pretensioned concrete cylinder pipe and steel coal-tar enameled coated pipe. |
|
Length |
2.17 mi |
|
Diameter |
42 in |
|
Capacity |
46 cfs |
|
Charleston Heights Lateral
|
Location |
Starts at a bifurcation on Twin Lakes Lateral and terminates at Las Vegas Valley Water District tanks. |
|
Construction period |
1981-1982 |
|
Description |
Pretensioned concrete cylinder pipe and steel coal-tar enameled coated pipe. |
|
Length |
0.14 mi |
|
Diameter |
42 in |
|
Capacity |
40 cfs |
|
Robinson Lateral
|
Location |
Begins at the Twin Lakes Pumping Plant and Forebay and extends to an existing North Las Vegas water tank located in the vicinity of the North Las Vegas Air Terminal. |
|
Construction period |
1981-1982 |
|
Description |
Asbestos-cement pressure pipe |
|
Length |
1.52 mi |
|
Diameter |
24 in |
|
Capacity |
10 cfs |
|
Colorado Street Lateral
|
Location |
Extends from Pumping Plant No. 7B near first stage Pumping Plant No. 7 to Boulder City's existing west water tank. |
|
Construction period |
1981-1982 |
|
Description |
Pretensioned concrete cylinder pipe |
|
Length |
0.52 mi |
|
Diameter |
18, 21, 27 in |
|
Capacity |
7.5 cfs |
|
Hemenway Lateral
|
Location |
On the Boulder City Lateral about 2,500 feet before lateral reaches Surge Tank No. 5. |
|
Construction period |
1981-1982 |
|
Description |
Asbestos-cement pressure pipe and steel pipe with Pritec coating and mortar lining. |
|
Length |
0.12 mi |
|
Diameter |
8-12 in |
|
Capacity |
2.5 cfs |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
First Stage |
|
|
|
|
|
Pumping Plant No. 1 |
10-0 sb |
311 |
223 |
10,000 |
|
PP No. 1A - Main Aqueduct |
6-1 sb |
300 |
355 |
15,000 |
|
PP No. 1A - Boulder City Lateral |
2-1 sb |
15 |
455 |
12,000 |
|
No. 2A |
6-1 sb |
300 |
355 |
15,000 |
|
No. 3 |
3-1 sb |
28 |
230 |
1,050 |
|
No. 4 |
2-1 sb |
15 |
455 |
1,200 |
|
No. 5 |
2-1 sb |
15 |
455 |
1,200 |
|
No. 6 |
3-1 sb |
90 |
182 |
2,400 |
|
No. 7 |
3-1 sb |
15 |
78 |
225 |
|
Second Stage |
|
|
|
|
|
PP No. 1 (modifications) |
10-0 sb |
312 |
223 |
10,000 |
|
PP No.1A - Boulder City Lateral (modifications) |
2-0 sb |
15 |
445 |
1,200 |
|
PP No. 4 (modifications) |
2-0 sb |
15 |
445 |
1,200 |
|
PP No. 5 (modifications) |
2-0 sb |
15 |
445 |
1,200 |
|
PP No. 1B |
6-1 sb |
306 |
355 |
18,000 |
|
PP No. 2B |
6-1 sb |
306 |
355 |
18,000 |
|
PP No. 7B |
3-1 sb |
7.5 |
175 |
225 |
|
Hacienda |
6-1 sb |
250 |
365 |
18,000 |
|
Twin Lakes - Robinson |
3-1 sb |
10 |
102 |
180 |
|
Twin Lakes - Carlton |
3-1 sb |
32 |
117 |
600 |
|
Power Facilities
Robert B. Griffith Water Project - First Stage Robert B. Griffith Water Project - Second Stage
|