![]() |
|
![]() |
||||||||||||||||||||||||||||||||||
|
Facilities in Operation |
||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||
|
Storage Facilities Carriage Facilities Coachella Canal |
||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||
|
Power Facilities The Imperial Irrigation District has constructed powerplants at Pilot Knot Check and Wasteway, and at Drop Nos. 2, 3 and 4 of the All-American Canal. Installed capacities of these plants are: |
||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||
|
The district also operates the 189.1 MW steam plant at El Centro. The 75 MW axis steam plant at Yucca is operated by the Arizona Public Service Company, but the Imperial Irrigation District has rights to 25 MW of the plant's production. Imperial's electrical distribution system interties with the Department of Energy's Parker-Davis system.
|
||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||
|
Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links |
||||||||||||||||||||||||||||||||||