Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 CRBSCP - Coachella Canal Unit 
 Engineering Data

CRBSCP - Coachella Canal Unit  -  Main Page

Facilities in Operation

Diversion Dams

1  

All-American Canal to Coachella Turnout

36.2 mi  

Coachella Canal

123 mi  

Storage Facilities

Carriage Facilities

Coachella Canal

Location

From Drop No. 1 on the All-American Canal to milepost 49 near Siphon No. 7 on the existing Coachella Canal

Construction period

1978-1982  

Total length of new canal

48.3 mi  

   Open channel

47.8 mi  

   Closed siphons

0.5 mi  

Capacity

1,550 cfs  

Typical section, concrete lined:

 

   Bottom width

16 ft  

   Side slopes

1.5:1  

   Water depth:

 

      From Station 9+31 to
       861+20 (16.1 mi)

10.4 ft  

      From Station 861+18 to
      siphon No. 7, (32.2 mi)

12 ft  

   Lining thickness

3 in  

Power Facilities

The Imperial Irrigation District has constructed powerplants at Pilot Knot Check and Wasteway, and at Drop Nos. 2, 3 and 4 of the All-American Canal. Installed capacities of these plants are:

Pilot Knob

33 MW  

Drop No. 2

10.0 MW  

Drop No. 3

9.8 MW  

Drop No. 4

19.6 MW  

The district also operates the 189.1 MW steam plant at El Centro. The 75 MW axis steam plant at Yucca is operated by the Arizona Public Service Company, but the Imperial Irrigation District has rights to 25 MW of the plant's production. Imperial's electrical distribution system interties with the Department of Energy's Parker-Davis system.

 

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links