|
BCP - Coachella Division - Main Page
Facilities in Operation
Canal Rehabilitation
|
Total canal length operated by CVWD: |
123 mi |
|
Length of lined canal |
86 mi |
|
Length of unlined canal |
37 mi |
|
Distribution system |
Underground concrete pipe size varies from 1 to 7 ft diameter |
|
Total length |
495 mi |
|
Pumping Plants |
22 |
|
Drains: |
|
|
Open |
27 mi |
|
Closed |
95 mi |
|
Regulating reservoir |
1 |
|
Automatic traveling debris screens1 |
10 units |
|
Central control headquarters building |
1 |
|
Telemetering control |
Microwave and UHF circuits linking the panel in the headquarters building with more than 150 responsive stations including the 10-bank automatic debris screens. |
|
1 5 constructed under the Rehabilitation & Betterment Program |
Coachella Canal Terminal Reservoir
Lake Cahuilla
|
Type: |
Earthen dike impoundment |
|
Location |
In Riverside County California near the Santa Rosa Mountains, about 8 miles from Indio on the west side of Coachella Valley. |
|
Construction period |
1968-1969 |
|
Structural height |
18.6 ft |
|
Top width |
100 ft |
|
Maximum base width |
193 ft |
|
Crest length |
6,276 ft |
|
Crest elevation |
4.0 ft |
|
Shoreline |
5.25 mi |
|
Slope (shore side) |
2:1 |
|
Slope (lake side) |
3:1 |
|
Reservoir lining |
Soil cement |
|
Reservoir Capacity |
1,300 acre-ft |
|
Dike No. 2
|
Type: |
Earthen dike |
|
Location |
Southwesterly end of Lake Cahuilla between Avenue 58 and Coral Reef near Avenue 59. |
|
Construction period |
1967-1968 |
|
Structural height |
20 ft |
|
Top width |
20 ft |
|
Maximum base width |
100 ft |
|
Crest length |
5,128 ft |
|
Crest elevation |
30.0 ft |
|
Slope |
2:1 |
|
Dike No. 4
|
Type: |
Earthen dike |
|
Location |
From Coral Reef to Avenue 66 near Martinez Canyon west of the terminus of Avenue 66. |
|
Construction period |
1967-1968 |
|
Structural height |
30 ft |
|
Top width |
20 ft |
|
Maximum base width |
140 ft |
|
Crest length |
18,480 ft |
|
Crest elevation |
26.0 ft |
|
Slope |
2:1 |
|
|