Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 PSMBP - Sargent Unit 
 Engineering Data

PSMBP - Sargent Unit  -  Main Page

Facilities in Operation

Diversion Dams

1      

Canals

39.6 mi  

Laterals

44.2 mi  

Pumping Plants

1      

Drains

19.4 mi  


Diversion Facilities

Milburn Diversion Dam

Type:

Concrete ogee-gated weir, embankment wings, stilling basin

Location:

On the Middle Loup River, about 23 mi northwest of Sargent, Nebraska

Year Constructed:

1955-1956  

Dimensions:

 

   Structural height

24.5 ft  

   Hydraulic height

13 ft  

   Weir crest length

76 ft  

   Total length

3,880 ft  

   Weir crest elevation

2,481.0 ft  

   Volume

70,000 yd3  

Sluiceway:

Concrete, two 22- by 7-ft radial gates.

Gate structure:

Concrete, two 22- by 7-ft radial gates.

Headworks:  Sargent canal:

Concrete, one 10- by 8.5-ft radial gate

   Diversion capacity

260 cfs  


Carriage Facilities

Sargent Canal

Location:

From Milburn Diversion Dam on the Middle Loup River about 3 miles northwest of Milburn, Nebraska, generally east along the north side of the Middle Loup River to about 10 miles southeast of Sargent, Nebraska.

Construction period:

1955-1958  

Length

39.6 mi  

Diversion capacity

260 cfs  

Typical section in earth:

 

   Bottom width

15 ft  

   Side slopes

2:1  

   Water depth

5 ft  


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Woods Park

1

6

19.5

10

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links