|
San Angelo Project - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Canals |
16 mi |
|
Laterals |
39 mi |
|
Storage Facilities
Twin Buttes Dam
Carriage Facilities
Main Canal
|
Location: |
Headworks south of Nasworthy Dam to project lands east of San Angelo, Texas. |
|
Construction period: |
1961-1963 |
|
Length |
15.9 mi |
|
Initial capacity |
165 cfs |
|
Typical section, concrete lined: |
|
|
Bottom width |
5 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5 ft |
|
Lining thickness |
2.5 in |
|
|