Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 San Angelo Project 
 Engineering Data

San Angelo Project  -  Main Page

Facilities in Operation

Storage Dams

1      

Canals

16 mi  

Laterals

39 mi  


Storage Facilities

Carriage Facilities

Main Canal

Location:

Headworks south of Nasworthy Dam to project lands east of San Angelo, Texas.

Construction period:

1961-1963  

Length

15.9 mi  

Initial capacity

165 cfs  

Typical section, concrete lined:

 

   Bottom width

5 ft  

   Side slopes

1.5:1  

   Water depth

5 ft  

   Lining thickness

2.5 in  

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links