 PSMBP - Riverton Unit 
 Engineering Data

PSMBP - Riverton Unit  -  Main Page

Facilities in Operation

Storage Dams

2      

Diversion Dams

1      

Canals

100 mi  

Laterals

300 mi  

Drains

644 mi  

Powerplants

1      

Transmission Lines

75.8 mi  

Substations

3      


Storage Facilities

Diversion Facilities

Carriage Facilities

Wyoming Canal

Location

From Wind River Diversion Dam on Wind River, about 32 miles northwest of Riverton, Wyoming, generally northeast along northern edge of irrigated area

Construction period

1920-1951  

Length

62.4 mi  

Diversion capacity

2,200 cfs  

Typical section in earth:

 

   Bottom width

65 ft  

   Side slopes

1.5:1  

   Water depth

10 ft  

Typical section, concrete lined:

 

   Bottom width

12.5 ft  

   Side slopes

1.5:1  

   Water depth

10 ft  

   Lining thickness

6 in  


Pilot Canal

Location

From Pilot Butte Reservoir generally southeast along southern edge of irrigated area

Construction period

1926-1947  

Length

38.2 mi  

Diversion capacity

1,000 cfs  

Typical section in earth:

 

   Bottom width

30 ft  

   Side slopes

2:1  

   Water depth

10 ft  

Typical section, lined with buried asphalt membrane:

 

   Bottom width

30 ft  

   Side slopes

2:1  

   Water depth

10 ft  


Power Facilities

 

 