North Platte Project - Main Page
Facilities in Operation
|
Storage Dams |
5 |
|
Diversion Dams |
4 |
|
Canals |
337 mi |
|
Laterals |
1,261 mi |
|
Pumping Plants |
1 |
|
Drains |
373 mi |
|
Powerplants |
1 |
|
Transmission Lines |
162.5 mi |
|
Substations |
4 |
|
Storage Facilities
Guernsey Dam Lake Alice Dam No. 1 (upper) Lake Alice Dam No. 1 1/2 (lower) Little Lake Alice Dam No. 2 Minatare Dam Pathfinder Dam Pathfinder Dike
Diversion Facilities
Whalen Diversion Dam
Horse Creek Diversion Dam
|
Type: |
Concrete weir, embankment wing. |
|
Location: |
On Horse Creek, 12 miles southeast of Torrington, Wyoming. |
|
Year Completed: |
1923 |
|
Dimensions: |
|
|
Structural height |
17 ft |
|
Hydraulic height |
6 ft |
|
Crest length |
720 ft |
|
Crest elevation |
4,122.0 ft |
|
Volume |
5,300 yd3 |
|
Diversion capacity |
430 cfs |
|
Dry Spotted Tail Diversion Dam
|
Type: |
Steel sheet pile and earth |
|
Location: |
On Dry Spotted Tail Creek, 3 miles north of Mitchell, Nebraska. |
|
Year Completed: |
1954 |
|
Dimensions: |
|
|
Structural height |
14.5 ft |
|
Hydraulic height |
13 ft |
|
Crest length |
255 ft |
|
Crest elevation |
3,996.0 ft |
|
Volume |
700 yd3 |
|
Diversion Capacity |
|
|
Tub Springs Creek Diversion Dam
|
Type: |
Steel sheet pile and earth |
|
Location: |
On Tub Springs Creek, about 6 miles east of Mitchell, Nebraska. |
|
Year Completed: |
1954 |
|
Dimensions: |
|
|
Structural height |
11 ft |
|
Hydraulic height |
9 ft |
|
Crest length |
205 ft |
|
Crest elevation |
4,000.0 ft |
|
Volume |
2,600 yd3 |
|
Diversion Capacity |
|
|
Carriage Facilities
Interstate Canal
|
Location: |
From Whalen Diversion Dam near Whalen, WY, southeast 55 miles along the North Platte River to Lake Alice. |
|
Construction period: |
1905-1915 |
|
Length |
95 mi |
|
Diversion capacity |
2,100 cfs |
|
Typical section in earth: |
|
|
Bottom width |
44 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
10 ft |
|
High-Line Canal - Interstate System
|
Location: |
From Lake Alice generally southeast about 25 miles. |
|
Construction period: |
1910-1913 |
|
Length |
35 mi |
|
Diversion capacity |
160 cfs |
|
Typical section in earth: |
|
|
Bottom width |
12 ft |
|
Side slopes |
2:1 |
|
Water depth |
4.5 ft |
|
Low-Line Canal - Interstate System
|
Location: |
From Lake Minatare generally southeast about 25 miles. |
|
Construction period: |
1913-1914 |
|
Length |
43 mi |
|
Diversion capacity |
430 cfs |
|
Typical section in earth: |
|
|
Bottom width |
16 ft |
|
Side slopes |
2:1 |
|
Water depth |
6 ft |
|
Reservoir Supply Canal - Interstate System
|
Location: |
From Lake Alice to Lake Minatare. |
|
Construction period: |
1910-1913 |
|
Length |
4.6 mi |
|
Diversion capacity |
492 cfs |
|
Typical section in earth: |
|
|
Bottom width |
22 ft |
|
Side slopes |
2:1 |
|
Water depth |
6 ft |
|
Fort Laramie Canal
|
Location: |
From Whalen Diversion Dam generally southwest about 60 miles to vicinity to Gering, Nebraska. |
|
Construction period: |
1915-1924 |
|
Length |
129 mi |
|
Diversion capacity |
1,500 cfs |
|
Typical section in earth: |
|
|
Bottom width |
45 ft |
|
Side slopes |
2:1 |
|
Bank height |
12 ft |
|
Water depth |
9 ft |
|
Northport Canal
|
Location: |
Vicinity of Vance, Nebraska |
|
Construction period: |
1919-1923 |
|
Length |
27 mi |
|
Diversion capacity |
250 cfs |
|
Typical section in earth: |
|
|
Bottom width |
20 ft |
|
Side slopes |
2:1 |
|
Water depth |
5.2 ft |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Dutch Flats Drainage |
3 |
8 |
30-52 |
70 |
|
Power Facilities
Guernsey Powerplant
|