|
PSMBP - Fort Clark Unit - Main Page
Facilities in Operation
|
Canals |
10 mi |
|
Laterals |
6 mi |
|
Pumping Plants |
4 |
|
Drains |
7 mi |
|
Carriage Facilities
Canal A
|
Location |
East along the Missouri River from Basin Electric Power Cooperative pump-house. |
|
Construction period |
1952-1953 |
|
Length |
1.6 mi |
|
Initial Capacity |
7 cfs |
|
Typical section in earth |
|
|
Bottom width |
3 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
1.6 ft |
|
Canal B
|
Location |
Generally southeast from Fort Clark Pumping Plant on the Missouri River |
|
Construction period |
1952-1953 |
|
Length |
6.4 mi |
|
Initial Capacity |
30 cfs |
|
Typical section in earth |
|
|
Bottom width |
4 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
2.5 ft |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Fort Clark Main |
2 |
30 |
95 |
400 |
|
Relift No. 1 |
1 |
5 |
31 |
25 |
|
Relift No. 2 |
1 |
4 |
17 |
10 |
|
Fort Clark Canal A |
1 |
7 |
50 |
50 |
|
|