Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 PSMBP - Fort Clark Unit 
 Engineering Data

PSMBP - Fort Clark Unit  -  Main Page

Facilities in Operation

Canals

10 mi  

Laterals

6 mi  

Pumping Plants

4      

Drains

7 mi  


Carriage Facilities

Canal A

Location

East along the Missouri River from Basin Electric Power Cooperative pump-house.

Construction period

1952-1953  

Length

1.6 mi  

Initial Capacity

7 cfs  

Typical section in earth

 

   Bottom width

3 ft  

   Side slopes

1.5:1  

   Water depth

1.6 ft  


Canal B

Location

Generally southeast from Fort Clark Pumping Plant on the Missouri River

Construction period

1952-1953  

Length

6.4 mi  

Initial Capacity

30 cfs  

Typical section in earth

 

   Bottom width

4 ft  

   Side slopes

1.5:1  

   Water depth

2.5 ft  


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total  horsepower

Fort Clark Main

2

30

95

400

Relift No. 1

1

  5

31

  25

Relift No. 2

1

  4

17

  10

Fort Clark Canal A

1

  7

50

  50

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links