Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 PSMBP - Crow Creek Pump Unit 
 Engineering Data

PSMBP - Crow Creek Pump Unit  -  Main Page

Facilities in Operation

Canals

11 miles  

Laterals

10 miles  

Pumping Plants

1          

Drains

     4.7 miles  


Carriage Facilities

Crow Creek Pumping Plant Discharge Line

Location

West from Crow Creek Pumping Plant on the Missouri River about 3 miles south of Toston, Montana.

Construction period

1953-1954  

Description:

Welded steel pipe

    Length

950 ft  

    Diameter

  52 in  

    Capacity

    100 cfs  


Toston Tunnel

Location

Northwest from end of Crow Creek Pumping Plant discharge line, about 3 miles south of Toston, Montana.

Construction period

1952-1953  

Length

2,044 ft  

Capacity

     100 cfs  

Cross section:

Horseshoe:

    Diameter

        6.5 ft  

    Lining

Concrete


Toston Canal

Location

Generally southwest from end of Toston Tunnel, about 3 miles south of Toston , Montana, to vicinity of Warm Springs Creek, about 8 miles southwest of Toston.

Construction period

1953-1954  

Length

        7.8 mi  

Diversion capacity

100 cfs  

Typical section in earth:

 

    Bottom width

8 ft  

    Side slopes

1.5:1  

    Water depth

   3.4 ft  


Lombard Canal

Location

From mile 2.2 on Toston Canal, about 3.5 miles south of Toston, Mont., generally north to a point about 2 miles southwest of Toston, then east to the Missouri River.

Construction period

1953-1954  

Length

   3 mi  

Diversion capacity

60 cfs  

Typical section in earth:

 

    Bottom width

7 ft  

    Side slopes

1.5:1  

    Water depth

  2.78 ft  


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Crow Creek Pumping Plant

3

100

180

2,700

 