PSMBP - Crow Creek Pump Unit - Main Page
Facilities in Operation
|
Canals |
11 miles |
|
Laterals |
10 miles |
|
Pumping Plants |
1 |
|
Drains |
4.7 miles |
|
Carriage Facilities
Crow Creek Pumping Plant Discharge Line
|
Location |
West from Crow Creek Pumping Plant on the Missouri River about 3 miles south of Toston, Montana. |
|
Construction period |
1953-1954 |
|
Description: |
Welded steel pipe |
|
Length |
950 ft |
|
Diameter |
52 in |
|
Capacity |
100 cfs |
|
Toston Tunnel
|
Location |
Northwest from end of Crow Creek Pumping Plant discharge line, about 3 miles south of Toston, Montana. |
|
Construction period |
1952-1953 |
|
Length |
2,044 ft |
|
Capacity |
100 cfs |
|
Cross section: |
Horseshoe: |
|
Diameter |
6.5 ft |
|
Lining |
Concrete |
|
Toston Canal
|
Location |
Generally southwest from end of Toston Tunnel, about 3 miles south of Toston , Montana, to vicinity of Warm Springs Creek, about 8 miles southwest of Toston. |
|
Construction period |
1953-1954 |
|
Length |
7.8 mi |
|
Diversion capacity |
100 cfs |
|
Typical section in earth: |
|
|
Bottom width |
8 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
3.4 ft |
|
Lombard Canal
|
Location |
From mile 2.2 on Toston Canal, about 3.5 miles south of Toston, Mont., generally north to a point about 2 miles southwest of Toston, then east to the Missouri River. |
|
Construction period |
1953-1954 |
|
Length |
3 mi |
|
Diversion capacity |
60 cfs |
|
Typical section in earth: |
|
|
Bottom width |
7 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
2.78 ft |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Crow Creek Pumping Plant |
3 |
100 |
180 |
2,700 |
|
|