Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 PSMBP - Cedar Bluff Unit 
 Engineering Data

PSMBP - Cedar Bluff Unit  -  Main Page

Facilities in Operation

Storage Dams

1      

Canals

18.1 mi  

Laterals

25.1 mi  

Surface drains

1.7 mi  

Subsurface drains

1.6 mi  


Storage Facilities

Carriage Facilities

Cedar Bluff Canal

Location

On the north side of the Smoky Hill River from Cedar Bluff Dam running in an easterly direction to near the town of Antonino, Kansas.

Construction period

1961-1963  

Length

18.1 mi  

Diversion capacity

125 cfs  

Typical section in earth:

 

   Bottom width

12 ft  

   Side slopes

2:1  

   Water depth

4.1 ft  

Typical section, earth lined:

 

   Bottom width

12 ft  

   Side slopes

2:1  

   Water depth

4.1 ft  

   Lining thickness

2 ft  

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links