Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Buford-Trenton Project 
 Engineering Data

Buford-Trenton Project  -  Main Page

Facilities in Operation

Canals

11.5 mi  

Laterals

34 mi  

Pumping plants

1      

Drains

31.6 mi  


Carriage Facilities

Main Canal

Location:

From Buford-Trenton Pumping Plant near Buford, North Dakota., about 12 miles northeast along Missouri River to vicinity of Trenton, North Dakota

Construction period:

1940-1942  

 

Portions of canal relocated in 1948, 1950, and 1954  

Length

11.5 mi  

Diversion capacity

250 cfs  

Typical section in earth:

 

   Bottom width

12 ft  

   Side slopes

1.5:1  

   Water depth

5.9 ft  

Typical section, clay lined:

 

   Bottom width

6 ft  

   Side slopes

1.5:1  

   Water depth

4 ft  

   Lining thickness

9 in  


 

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Buford-Trenton

3

240

26-31

850

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links