Buford-Trenton Project - Main Page
Facilities in Operation
|
Canals |
11.5 mi |
|
Laterals |
34 mi |
|
Pumping plants |
1 |
|
Drains |
31.6 mi |
|
Carriage Facilities
Main Canal
|
Location: |
From Buford-Trenton Pumping Plant near Buford, North Dakota., about 12 miles northeast along Missouri River to vicinity of Trenton, North Dakota |
|
Construction period: |
1940-1942 |
| |
Portions of canal relocated in 1948, 1950, and 1954 |
|
Length |
11.5 mi |
|
Diversion capacity |
250 cfs |
|
Typical section in earth: |
|
|
Bottom width |
12 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5.9 ft |
|
Typical section, clay lined: |
|
|
Bottom width |
6 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
4 ft |
|
Lining thickness |
9 in |
|
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Buford-Trenton |
3 |
240 |
26-31 |
850 |
|
|