Belle Fourche Project - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Diversion Dams |
1 |
|
Canals |
93.5 mi |
|
Laterals |
450 mi. |
|
Drains |
232 mi. |
|
Storage Facilities
Belle Fourche Dam
Diversion Facilities
|
Type: |
Concrete gravity ogee weir with flanking earth dikes |
|
Location: |
On Belle Fourche River, 1.5 miles northeast of Belle Fourche, South Dakota. |
|
Year Completed: |
1907 |
|
Dimensions |
|
|
Structural height |
36 ft |
|
Hydraulic height |
18 ft |
|
Weir crest length |
400 ft |
|
Total length |
2,523 ft |
|
Weir crest elevation |
2998.0 ft |
|
Volume |
35,700 yd³ |
|
Diversion capacity |
1,300 cfs |
|
Sluice gates: |
Three slide gates, each 5 by 10 ft |
|
Outlet works: |
Seven slide gates, each 5 by 10 ft. |
|
Capacity |
3,150 cfs |
|
Carriage Facilities
Inlet Canal
|
Location: |
Belle Fourche Diversion Dam generally east to Belle Fourche Reservoir |
|
Construction Period: |
1905-1906 |
|
Length |
6.3 mi |
|
Diversion capacity |
1,300 cfs |
|
Typical section in earth: |
|
|
Bottom width |
40 ft |
|
Side slopes |
1:1 |
|
Water depth |
10 ft |
|
North Canal
|
Location: |
From Belle Fourche Dam north about 5 mi, then generally southeast about 19 mi to vicinity of Newell, South Dakota. |
|
Construction Period: |
1908-1916 |
|
Length |
43 mi |
|
Initial capacity |
600 cfs |
|
Typical section in earth: |
|
|
Bottom width |
30 ft |
|
Side slopes |
2:1 |
|
Water depth |
5 ft |
|
South Canal
|
Location: |
From Belle Fourche Reservoir generally southeast about 20 miles. |
|
Construction Period: |
1906-1910 |
|
Length |
44 mi |
|
Initial capacity |
300 cfs |
|
Typical section in earth: |
|
|
Bottom width |
18 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5 ft |
|
|