|
PSMBP - Ainsworth Unit - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Canals |
52.9 mi |
|
Laterals |
169.7 mi |
|
Storage Facilities
Merritt Dam
Carriage Facilities
Ainsworth Canal
|
Location: |
From Merritt Dam outlet works, extends eastward through the Sandhills to the project lands. |
|
Construction period: |
1961-1965 |
|
Length |
52.9 mi |
|
Diversion capacity |
580 cfs |
|
Typical section, concrete lined |
|
|
Bottom width |
9 ft |
|
Side slopes |
2:1 |
|
Water depth |
7.22 ft |
|
Lining thickness |
3.5 in |
|
|