Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index

 

Red Fleet Dam

Red Fleet Dam


Statistics

General

  • Region (Map)  ................... Upper Colorado
  • State (Map) .......................  Utah
  • County ................................ Uintah
  • Project: ............................... CUP-Jensen Unit
  • Dam type: ........................... Earthfill
  • Location: ............................ Near Vernal
  • Watercourse: ..................... Big Bush Creek
  • Reservoir: ............................Red Fleet
  • Construction Date: ........... 1980
  • National ID Number ......... UT82901
  • Hydrologic Unit Code ....

Dimensions


Hydraulics

  • Normal Water Surface Elev: .............. 5506.7 ft
  • Hydraulic Height: ................................. 139.0 ft
  • Service Spillway Type:
  •    Uncontrolled  Crest    ................................Yes
  •    Morning-Glory ........................................... No
  •    Crest Length    ...................................... 32.0 ft
  •    Gated      ...................................................... No
  •    Capacity at Elev:  5621  ft,                 5510 cfs
  • Auxiliary Spillway ......................................... No
  •     Capacity at Elev.   .................................. 0 cfs
  • Outlet Works Capacity at
  •     Elevation  5621 ft.,  ............................ 550 cfs

Hydrology

  • Drainage Area: ..................................... 83 sq mi
  • Hydrometeorological Report      HMR
  • Flood Type: ...............................General
  • Storm Duration: .......................................  hrs
  • Probable Maximum Flood (PMF) Report:
  •   Peak Inflow: ..................................  cfs
  •   Inflow Volume: ........................  acre-ft
  •   Flow Duration: ......................................0 days
  •   PMF Routing MWS Elev.: ................. x.0 ft
  •   Initial Routing Elev: ............................ x.0 ft
  •   Study Date:


Power Generation


Narration

 


Geology

Red Fleet Dam and Reservoir are located on the south flank of the Uinta Mountains in the unglaciated valley of Big Brush Creek, a tributary of the Green River.  The stream begins near the crest of the range and flows in a southwest direction to the Green River.  The oldest rocks exposed in the drainage area are Precambrian age and occur in the headwaters of the basin.  Successively younger rocks crop out down the river valley.  These rocks form a thick layer of roughly parallel sedimentary beds as young as mid-Cretaceous in age.  Initially, they formed a horizontal layer overlying a relatively flat erosion surface on Precambrian age.  Following the uplift in late Cretaceous time, they formed an anticline over a core of Precambrian rock.  Erosion removed the cover over the crest of the fold and the Paleozoic and Mesozoic rocks now occur on the flanks of the range as a succession of outward dipping beds.  Rock formations of Mesozoic age underlie the reservoir, while the damsite is underlain only by rocks of Cretaceous age.  Further downstream, Tertiary age sediments, deposited after the older beds were folded, blanket the Unita Basin floor and cover many of the interstream areas on the mountain slope.  These rocks occur in relatively horizontal layers and in many places lap up on the eroded edges of the older sediments.


Links

 | Recreation |

 | Dams Located by State | USBR Utah Dams | Upper Colorado Region Dams |

 | Owner:  Bureau of Reclamation, Provo Area Office,
                   302 East 1860 South, Provo, UT 84606-7317, (801) 379-1101

 | Operator:  Uintah Water Conservancy District,
                        78 West 3325 North, Vernal, UT 84078, (435) 789-1651

 

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links