 |
Hydraulics
Normal Water Surface Elev: ............... 2170.0 ft
Hydraulic Height: .................................... 90.0 ft
Service Spillway Type:
Uncontrolled Crest ............................... Yes
Morning-Glory ............................................ No
Crest Length .......................................... 30 ft
Gated ....................................................... No
Capacity at Elev: 2169.7 ft,.............. 1,095 cfs
Auxiliary Spillway ......................................... No
Capacity at Elev. .................................... NA
Outlet Works Capacity at
Elevation ft., .................................... 960 cfs |
|
|
Hydrology
Drainage Area: ........................................... sq mi
Hydrometeorological Report (HMR) HMR x
Flood Type: ............................... General
Storm Duration: ....................................... hrs
Probable Maximum Flood (PMF) Report:
Peak Inflow: .................................. cfs
Inflow Volume: ........................ acre-ft
Flow Duration: ......................................0 days
PMF Routing MWS Elev.: ................. x.0 ft
Initial Routing Elev: ............................ x.0 ft
Study Date: xx 19 |
 |
|