 |
Hydraulics
Normal Water Surface Elev: ................. 4788 ft
Hydraulic Height: .................................. 86 ft
Service Spillway Type:
Uncontrolled Crest ...............................Yes
Morning-Glory .......................................... No
Crest Length ............................................. ft
Gated ...................................................... No
Capacity at Elev: ft, x,xxx cfs
Auxiliary Spillway ........................................ No
Capacity at Elev. ................................... cfs
Outlet Works Capacity at
Elevation 4,788 ft., ........................ 2,100 cfs |
|
|
Hydrology
Drainage Area: ........................................... sq mi
Hydrometeorological Report HMR xx
Flood Type: ............................................ General
Storm Duration: ............................................ hrs
Probable Maximum Flood (PMF) Report:
Peak Inflow: ..................................... 32,777 cfs
Inflow Volume: ..................... 69,000 acre-ft
Flow Duration: ........................................5 days
PMF Routing MWS Elev.: ...................... x.0 ft
Initial Routing Elev: ................................. x.0 ft
Study Date: ............................. December 1972 |
 |
|